The project includes: (1) the construction of three coal-fired units each at Suralaya, including associated works and a transmission line from Cilegon to Cibinong, with associated substations; (2) consulting services for engineering, design and construction supervision of the uni
绿色能源/碳资源对接 C-tier:碳汇