The project comprises: (a) the construction of the last stage of Chandrapur thermal power station by the addition of a 500 MW coal-fired unit; (b) the construction of a 500 kv, 1,500 MW high voltage direct current line from Chandrapur to Padghe, near Bombay, and the related term
绿色能源/碳资源对接 C-tier:碳汇