可对接 零碳园区 · 国际采购/招标
供给侧 · TRTürkiye Electricity Transmission Corporation (TEİAŞ)
↔
需求侧 · —Rwanda Energy Group - Energy Development Corporation Limited
- 撮合编号
- CDPA000250
- 匹配分
- 67 / 100
- 标的规模
- 项目级 · 规模待核
- 居间服务费
- 待核(按登记标的 2% 逐单计收|未成交不收费)
- 跨境属性
- 同域
- 数据溯源
- ch_supply:vlp:green|wb|P508354 ↔ ch_demand:wld:em:op00441892constructionofnewrwamaganaindustrialparksubstation
供给侧资产
Türkiye - Transforming Power Transmission System Project
机构 Türkiye Electricity Transmission Corporation (TEİAŞ)品类 Europe and Central Asia/能源国别 TR标的 ¥50.26 亿
垂直域(green)· The project will finance the construction of new substations and substation upgrades to enable the integration of large-scale renewables in the short term and avoid curtailment of the coming RE projects. In parallel, it will finance new and upgrades of transmission lines and subs · 金额口径:USD 按 7.1 折算,非成交价
需求侧意向
Construction of new Rwamagana Industrial Park Substation
买方 Rwanda Energy Group - Energy Development Corporation Limited品类 国际采购/招标国别 —预算 ¥0
截止 2026-06-19 · 原始金额 0 · 来源 real_trade_sources.db
如何成交
- 自助对接(免费):用上面的邮件按钮直接联系需求方,附上你的碳资产基本信息与报价。
- 免费登记(免费):把你自己的碳需求/供给登记进来,系统即时撮合。
- 付费优先委托(¥4,800 起,成交可全额抵扣):我们代你核验对手方资质、比对多家报价、出具撮合方案与合规提示,并对接至签约。
- 成交计费:撮合成功后按成交额的 2% 收取居间服务费;未成交不收费。
风险与合规:本平台不签发、不代签碳信用,不代表任何一方的碳资产已获核证;标的的权属、核证状态、履约与交割须由交易双方依各自法域法规与专业机构意见办理。本页信息来源于公开渠道,平台不做真实性背书。