A 级 Construction of foot bridge and ropeways under DPO, IDP, Shimla for the F.Y. 2024-25. These will be carried out in different areas. It involves multiple contracts.
需求方:—国别:IN/IN规模:面议品类:工程·基建
常规 Procurement of Azos(4500 Nos), PB (4750 Nos), Rhi(250 Nos),MN-mix(0.3125 MT) ,GYP(10 MT),Znso4 (2.5 MT), Pseudo(88 Kg), Azad (0.03%) (562.5 lit),vermi bag(10 Nos), Earth worm (100 kg),Vermi shed (10 N
需求方:—国别:IN/IN规模:面议品类:矿产·金属